![]() For production mines, proposed maximum annual tonnage to be extractedĭetailed guidance on these requirements is available on the Notice of Work Overview page at and applicants are encouraged to consult that information prior to starting their application.Current state of land (vegetation, access, physiography, structures, etc.). ![]() Detailed directions from public roads to the mine site.Details about water use or changes you may make in or about a stream.How you will access your mine site including existing access, construction and stream crossings details (road length, culverts, etc.).Full reclamation plan of all the proposed mining activities (timing, disturbance area and estimated cost) consider progressive reclamation.roads/trails, drill pads with sumps, trenching/test pits, pit run etc.) ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |